ID 503911

Archived

Main Wastewater Treatment Plant Digester Upgrade Project, Phase 3, Oakland CA

Alameda County

Owner Reference: SD356

Bid Date: 08/14/2019 at 01:30pm

Pre-Bid: 07/14/2019
Bidders/bid walk attendees shall assemble at the Main Wastewater Treatment Plant

Estimate: $16.0M - $20.0M

Work includes demolition of existing work, structural and mechanical rehabilitation of digesters 2, 3, and 4. This includes installation of a biogas piping, replacement of the existing floating covers on Digester 3 and 4 with dual membrane covers, and miscellaneous installation or replacement of piping, fan, electrical, instrumentation, and controls. In addition, work includes the removal of existing coating and installation of new coating on steel and concrete surfaces on Digester 7. 880 calendar days.

East Bay Municipal Utility District, Engineering, CA

Donald Kiang
 (510) 287-1686
 (510) 287-1260

Published 06/23/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.