Main Wastewater Treatment Plant Hypochlorite Piping Replacement Phase 2 & LOX Storage Tanks Improvements Project, Oakland CA

Alameda County

Owner Reference: SD390

Bid Date: 03/18/2020 at 02:00pm

Pre-Bid: 02/26/2020
Attendees shall assemble at the District's Main Wastewater Treatment Plant, in the Administration Building, Laboratory Library, at 2020 Wake Avenue, Oakland, Ca

Estimate: $4.1M - $4.6M

Work includes the following: Sodium Hypochlorite Pipe Replacement: Select demolition and replacement of hypochlorite piping, valves, associated supports; demolition and replacement of chemical feed pumps and associated concrete bases; demolition and replacement of pneumatic control valves; recoating and rehabilitation of fiberglass reinforced plastic tanks for hypochlorite storage; demolition or support of existing underground utilities during buried pipe and chemical trench installation work; dewatering, site restoration, and surveying; clearing and grubbing, removal of site debris; demolition and replacement of electrical control panels, conduits, wires; installation of junction boxes, process instruments; installation of variable frequency drives and control panels; handling and proper disposal of debris and hazardous waste; and all required testing and training. LOX Storage Tanks Improvements: Select demolition of existing liquid oxygen copper piping and appurtenances; demolition and replacement of concrete curb and removable bollards; installation of welded stainless steel piping, brazed copper piping, instrument tubing, pipe supports, and appurtenances; installation of approximately 50 feet of underground electrical conduit, power and control wiring; installation of fill station control panel, instrumentation, and concrete support bases pads; handling and proper disposal of debris and hazardous waste; and all required testing and training. Wet Weather Storage Improvements: Select demolition of existing wet weather storage basin pipes; demolition of existing non-shrink grout; demolition of existing pump lifting rails; demolition of existing access hatch covers; fabrication, coating, and installation of new wet weather storage basin pipes and pipe supports; installation of new non-shrink grout; fabrication and installation of new pump lifting rails, intermediate guide rail brackets, and upper mounting bracket; fabrication and installation of replacement access hatch covers; handling and proper disposal of debris and waste; and all required testing and training. 320 calendar days.

East Bay Municipal Utility District, Purchasing, CA

Chris Shumate
 (510) 287-0458

Published 02/08/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.