ID 527183

Archived

MALSR Light Lane Obstruction Clearing Project, Atlanta GA

Fulton County

Owner Reference: 20ITB011620K-CRB

Bid Date: 03/05/2020 at 11:00AM

Pre-Bid: 02/13/2020
Fulton County Airport, 3977 Aviation Circle, Room 103 Atlanta GA 30336

The contractor shall conduct his construction Operations as shown on the project layout and safety Plan and his approved phasing plan. The contractor shall Coordinate all construction activities with the engineer To minimize disruption to airport operations. It is the Contractor's responsibility to ensure compliance with Safety requirements and to minimize interference to Aircraft operations during construction. The contractor's staging area and haul routes shown on The plans are general and for information purposes Only. The actual size and location of staging areas and Haul routes will be approved by owner prior to Construction. All existing grassed areas which are disturbed as part of The contractor's access road, contractor's staging Area, and haul routes shall be restored to their original Condition after completion of the project. In addition, all Existing roads, aprons and taxiways that will be used as The contractor's haul route shall be maintained during Construction and restored to their pre-construction Condition. No separate measurement or payment will be Made for this item. Active taxiways, runways, and ramps shall be kept free of All debris, dirt, etc., at all times. Any spillage of soil, Debris or other materials shall be cleaned up Immediately using appropriate power sweepers, blowers Or other approved equipment, by the contractor after Prompt notification by the engineer or airport owner. Dust generated due to construction activities shall be Adequately controlled at all times. A program of Regular runway and taxiway inspection shall be Implemented by the contractor, and coordinated with the Airport owner, and the engineer. All lights, signs, and circuits are to be tested "Daily" Prior to contractor leaving site to ensure all items are Deemed to be in proper working order. All runway and Taxiway circuits shall be operational prior to the Contractor leaving site each day. Bids must be accompanied by a bid bond or certified check in an amount of five percent (5%) of the total amount of the base bid. This project encouraged MBE/WBE participation.

Fulton County Department Of Purchasing

Craig R. Bogan
 (404) 612-7660
 Login or create an account To view email

Published 02/03/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.