Marin & Napoleon Bridge Replacement Project, San Francisco, CA

San Mateo County

Owner Reference: 20-J-C-022

Bid Date: 02/29/2020 at 05:00pm

Estimate: TruongQ@samtrans.com

The Marin Street Bridge work consists of reconstructing walkways on both sides of the structure and repair existing cracks and spalls within the superstructure. The Napoleon Street Bridge work consists of removing two outer structure spans of the bridge and replace them with elevated soil berms. The middle span will be reconstructed using new girders with new micropiles next to existing pile foundations. The tracks infrastructure within the project limits will be reconstructed.

San Mateo County Transit

Quoc Truong
 (650) 508-7732
 650.508.6270

Published 02/18/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.