ID 525749
Archived
San Francisco County
Owner Reference: 11739
Bid Date: 02/25/2020 at 02:00pm
Pre-Bid: 01/29/2020
Marina Middle School, 3500 Fillmore Street, San Francisco, California
Estimate: $2,500,000.00
The Project is generally described as: Contractor shall provide labor and materials for complete soil improvements to Marina Middle School as described in bid document. Soils have been partially improved at the site and contractor is expected to provide all labor and materials in base bid meet the performance criteria defined in the bid documents. Soil improvement work will include, but not limited to; subgrade permeation and compaction grouting for soil stabilization below Buildings C and D. No compaction grouting shall be performed at the interior of the buildings. The scope of work is outlined in provided Geotechnical Report and Geotechnical Report Addendum #1 by Langan Engineering and Environmental Services as well as DSA approved construction documents by Bartos Architecture. This job is to be completed prior to September 30, 2020. Each Bid Proposal shall be accompanied by Bid Security in an amount not less than ten percent (10%) of the maximum amount of the Bid Proposal, inclusive of any additive Alternate Bid Item(s).
San Francisco Unified School District
Gioia Suplick
(415) 355-6979
Login or create an account To view email
Published 01/21/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.