ID 528445

Archived

Mary Walker Health Center Renovations Phase II Project, Oswego NY

Oswego County

Owner Reference: 100089-2

Bid Date: 03/10/2020 at 02:30PM

Pre-Bid: 02/25/2020
Mary Walker Health Center, SUNY Oswego, 402 Culkin Hall Oswego, NY 13126

Project consists of work on the basement, first floor and roof. Interior demolition work included is: Abatement of steel beam fireproofing (basement); including duct removal, Ceiling removals, replacements, and floor penetrations associated with duct work, refrigerant lines, and proposed equipment locations. Basement wall penetrations and wall removals for pathways. Remove existing baseboard heating system. New work included is: Chases and replacement partitions associated with vertical pathways. Electrical upgrades through-out. Incorporate designed A/C and ventilation systems (1st floor only). Locate (7) condenser units. Complete NFPA 13 Sprinklers system including cloud ceilings. South and East Storefront Entrances: Include new aluminum storefront doors and enclosures. Include entrance floor mat in south vestibule. This project encouraged MBE/WBE participation.

State University of New York (SUNY)

Richard Merritt
 (315) 312-2208
 (315) 312-2916
 Login or create an account To view email

Published 02/12/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.