This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450

ID: 486671

MBC Cooling Water System Chiller Upgrade Project, San Diego CA

San Diego County

Owner Reference: K-19-1802-DBB-3

02/28/2019
Past bid date

Estimate: $2,400,000

Trades: General Engineering Contractor

Licenses: A

The project involves the replacement of: two existing 370-ton chillers with three new units 250-ton units; three existing primary water pumps with four new pumps; the Staefa process control unit with Programmable Controls tied directly to the Ovation Distributed Control System (DCS); all of the existing valves and valve actuators with new unites that meet specifications and DCS requirements; and two secondary water pumps and associated variable frequency drives. This project also includes the replacement of all the concrete slab and pads within existing chiller area to ccommodate the new equipment and all necessary piping, mechanical, electrical, instrumentation and controls as required by the cooling water system chillers upgrades. Prevailing wages apply. Bonds required. Project time is 250 working days.

Antoinette Sanfilippo
 Upgrade Membership
 Upgrade Membership
 Upgrade Membership

OwnerLogin or create an account to see more project details. Basic membership is FREE


20190115085141519 K-19-1802-DBB-3 - Solicitation Document FINAL.pdf
Published 02/09/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.