ID 496130

Archived

Measure A - Group 10 Pavement Rehabilitation Project, Novato, CA

Marin County

Owner Reference: 18-001

Bid Date: 05/07/2019 at 02:00pm

Estimate: $1,500,000 to $1,600,000

The work to be done includes, but is not limited to: rehabilitation of the pavement on Nave Drive between Alameda Del Prado and Bel Marin Keys Blvd, Bel Marin Keys Blvd from Nave Drive to 200 ft. North of Digital Drive, and Bolling Drive from Nave Drive to Marin Valley Drive. The improvements will include construction of ADA compliant access ramps, removal and replacement of damaged concrete curb, gutter and sidewalk, replacement of existing traffic signal detection, pavement repairs consisting of asphalt concrete dig-out and patches, slurry seal application at some locations, grinding of the existing pavement, placement of reinforcing fabric, hot mix asphalt overlay, replacement of pavement striping and markings, installation of new traffic signs and other items or details not mentioned above that are required by the plans, standard specifications, or these special provisions to be performed, placed, constructed, or installed. Time for completion is 30 working days. Bonds required. Prevailing wages apply. DBE Goals.

City Of Novato

Gosia Woodfin
 (415) 899-8997
 (415) 899-8251
 Login or create an account To view email

Published 04/16/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.