ID 521316

Archived

Metzger North-South Fire Flow Project, Beaverton OR

Washington County

Owner Reference: P-156

Bid Date: 01/08/2020 at 02:00pm

Scope consists of furnishing labor, equipment and materials for construction of approx. 8,700 LF of 16” ductile iron restrained joint water piping with ductile iron fittings and polyethylene encasement and approx. 1,900 LF of 12” ductile iron retrained joint water piping with ductile iron fittings and polyethylene encasement; trenchless crossing of Hwy 99W; pipeline appurtenances, testing & special inspection, associated surface restoration, clean-up, traffic control, erosion control and incidental related work. 149 calendar days.

Tualatin Valley Water District
 (503) 848-3054

Published 12/07/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.