ID 524685

Archived

Milton Avenue Improvements, Project, Alpharetta GA

Fulton County

Owner Reference: 20-012

Bid Date: 02/06/2020 at 02:00pm

The City is requesting bids from qualified contractors to provide all materials, labor, and equipment for the complete construction of the Milton Avenue Improvements project. The project scope includes, but is not limited to, asphalt paving, construction of brick paver sidewalks, construction of concrete sidewalks, installation of rectangular rapid flashing beacons, pavement markings, and associated work. The locations of the work are along the frontage of 92, 90, and 80 Milton Avenue and the intersection of Roswell Street and Old Roswell Street --- within the City of Alpharetta, Georgia. The scope of Line Item 1.22 “Rectangular Rapid Flashing Beacon #1, Design and Installation (Milton Avenue)” includes all materials and labor necessary for the following: Installation of two (2) 14’ pedestal poles with breakaway bases. Poles and bases shall have a black powder coat finish. Each pole shall include:Type 2 Pull Box. Pedestrian Push Button Station (Polara Bulldog Style with LED) with R10-25 (9”x12”) sign.

City of Alpharetta

Debora Westbrook
 (678) 297-6052
 Login or create an account To view email

Published 01/13/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.