ID 505242

Archived

Monterey Regional Airport Infield & Taxiway Improvements Phase 1 Project, Monterey, CA

Monterey County

Bid Date: 07/26/2019 at 01:00pm

Pre-Bid: 07/16/2019
Monterey Peninsula Airport District offices on the second floor of the Terminal Bldg. 200 Fred Kane Drive, Suite 200, Monterey, CA

The Monterey Peninsula Airport District is inviting bids for all labor, tools, equipment, and expenses to provide the following items of work. 1. Airfield safety and security. 2. Construction site environmental compliance. 3. Removal, through a recycle effort, existing asphalt pavement / aggregate base and chip seal sections. 4. Earthwork, grading, and subgrade preparation. 5. Trenching, backfill, and compaction. 6. Storm drainage improvements including removals and instal lations. 7. Electrical conduit and conductor, edge light and guidance sign removals and installations. 8. Aggregate base and hot-mix asphalt pavement. 9. Cape seal surfacing (chip seal followed by slurry seal). 10. Slurry seal surfacing. 11. Pavement marking removals and installations. Bonds required. Prevailing wages apply. he time limit for completion of the work is as follows: Base Bid: 60 Working Days Additive Alternate A: An additional 110 Working Days (170 total) Additive Alternate B: An additional 30 Working Days (200 total) Additive Alternate C: An additional 20 Working Days (220 total)

Monterey Peninsula Airport

Ann Campo
 831.648.7011
 831.648.7021

Published 07/07/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.