ID 493872

Archived

Montezuma/Mid-City Pipeline Phase 2 & 70th Alvarado To Saranac Sidewalk Project, San Diego, CA

San Diego County

Owner Reference: K-19-1821-DBB-3

Bid Date: 06/19/2019 at 02:00pm

Estimate: $40,519,000

The City's Public Works Department is planning to install roughly 1.0 miles of new water pipeline, which consists of approximately 4,880 linear feet of new 66" diameter CML&TC steel transmission main and 420 linear feet of 8-inch PVC distribution main. Work also includes 2,530 linear feet of 16-inch cast iron pipeline abandonment, as well as, associated required street ADA improvements and paving. The 66-inch transmission main will run southward from the Alvarado Water Treatment Plant (AWTP) to the intersection of 69th and Mohawk Street. The north terminus of the pipeline will be connected to existing Valve Vault No. 3 located where the Earl Thomas Reservoir Outlet Pipeline intersects the Clear Wells Interconnection Pipeline. The south terminus will connect to the Mid-City Phase 2A Pipeline just easterly of the 69th and Mohawk Street intersection. Additionally, in the Helix Water District, Work also includes the relocation and construction of a new 8-inch PVC Distribution Main running along Lake Murray Blvd north of Wisconsin Ave, its Water services, and all other work shown on plans and specifications. Lastly, in the City of La Mesa, work includes the removal of an 8-inch Sewer pipeline and manholes and replacing them with new as shown on the plans & specifications. Alternates included in the attached. Project Duration: 640 Working Days. Bonds required. Prevailing wages apply. Preferences: ELBE (13.2%) , Prequalification & SLBE (9.1%).

City of San Diego, Public Works Contracts, CA

Brittany Friedenreich
 (619) 533-3104
 Login or create an account To view email

Published 05/31/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.