ID 525505

Archived

Morganton Regional Readiness Center Phase II New Construction Project, Raleigh NC

Wake County

Owner Reference: SCO-16-14394-02B

Bid Date: 02/20/2020 at 02:00pm

Pre-Bid: 02/06/2020
Morganton National Guard Armory, 411 Kirksey Drive, Morganton NC

The work of the project is defined by the Contract Documents and consists of the following: This project is Phase II of two phases with separate contracts. Phase I, currently under contract, includes site work, underground utilities and hazardous material abatement of buildings to be demolished in phase II. Construction of new NCDPS Corrections facilities to replace buildings being demolished during phase II are also in phase I work. Phase II includes demolition of existing correctional facilities on the project site and the following new facilities: GENERAL SITE WORK: Site grading, underground storm-water system, site utilities, asphalt and concrete paving, security fencing and gates, seeding and landscaping. BUILDING 1 CENTRAL BUILDING: Primary readiness center building comprising two story administrative wing, single story drill hall with commercial kitchen, and a single story storage/locker area wing. BUILDING 2 GENERAL PURPOSE TRAINING BAY (Alternate A-6): One story vehicle maintenance bay with associated storage and office space. Bid alternate. BUILDING 3 UNHEATED STORAGE BUILDING: One story metal building. BUILDING 4 WASHBAY (Alternate A-2): Freestanding external washbay, open steel frame construction, standing seam metal roof. Please note this building is being added to the project by design amendment, not yet executed, no structural drawings available at this time. Bid Alternate. BUILDING 5 GUARDHOUSE (Alternate A-3): Freestanding guardhouse at entry control point, load-bearing masonry construction, standing seam metal roof. Bid alternate. Demolition work includes demolition of site improvements and buildings. Buildings to be demolished include: a 16-story correctional building, two metal buildings, three classroom modulars and four freestanding guardtowers. Asbestos and other hazardous materials abatement will be performed under the Phase I contract prior to the Notice to Proceed for Phase II. New work includes but is not limited to: concrete slab on grade, masonry and metal stud walls, structural steel, steel pan stairs, metal roof and wall panels, membrane roofs, hollow metal doors and frames, solid core wood doors, storefront doors and framing, coiling overhead doors, interior and exterior glazing, tile, epoxy terrazzo, resilient floor finishes, fluid applied epoxy flooring, acoustic ceiling panel systems, toilet partitions and accessories, commercial kitchen equipment, laminate casework, solid surface counters, pre-engineered metal buildings, passenger elevator, fire sprinkler systems, plumbing, mechanical electrical and telecom systems. This project encouraged MBE/WBE participation.

North Carolina National Guard

Cynthia Turner
 (919) 664-6255
 Login or create an account To view email

Published 01/20/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.