ID 494177
Archived
Solano County
Bid Date: 05/07/2019 at 02:00pm
Pre-Bid: 04/16/2019
North Bay Regional Water Treatment Plant, 5110 Waterworks Lane, Fairfield, CA 94533
Estimate: $3,357,000
This Project includes, but is not limited to, furnishing and installing the following: new ozone generation equipment; cooling water equipment; ozone diffusion systems; ozone destruct equipment; piping, valving, and instrumentation; electrical equipment; and controls. All equipment shall be installed in accordance with the manufacturer's requirements and recommendations. A more detailed summary of the Project is included in Section 01110 (Summary of Work). Bonds required. Q&A due by 04/26/19 at 2Pm. Prevailing wages.
City of Fairfield, Public Works, CA
David Vong
(707) 428-7485
(707) 428-7607
Published 04/02/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.