ID 516150

Archived

Northwest Water Treatment Plant Expansion & Upgrades Project, Bolivia NC

Columbus County

Owner Reference: 299-nwwtpexpansionupgrades

Bid Date: 12/12/2019 at 03:00pm

Pre-Bid: 10/30/2019
Brunswick County Public Utilities Operations Center, 250 Grey Water Road NE, Supply, NC

Expansion of the conventional process treatment capacity; improvements to the rapid mixing, clarification and filtration processes; upgrades to the treatment process including low pressure reverse osmosis; extensive modifications to the yard piping systems, including new raw water influent, finished water, waste solids and stormwater discharge piping; and RO concentrate discharge force main to the Cape Fear River (under separate contract). The expanded plant will process 45 MGD through conventional treatment and 36 MGD through reverse osmosis. This project encouraged MBE/WBE participation.

Brunswick County

Bob Tweedy
 (910) 253-2025
 Login or create an account To view email

Published 10/17/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.