ID 505248

Archived

Otay 1st & 2nd Pipelines West Of Highland Avenue Project, San Diego, CA

San Diego County

Owner Reference: K-20-1833-DBB-3-A

Bid Date: 08/01/2019 at 02:00pm

Estimate: $21,916,000

The City of San Diego is inviting bids for all labor, tools, equipment, and expense to install new and replacement of a total 5.2 miles of Water transmission main and Water Distribution main. The project will replace old deteriorated steel transmission mains with 36", 24" CMLS transmission main. The project will also replace CI and AC water distribution mains with new 16", 12" and 8" PVC distribution mains. Time to complete 500 working days. Bonds required. Prevailing wages apply.

City of San Diego, Engineering/Capital Projects, CA

Ronald McMinn, Jr.
 (619) 533-4618
 (619) 533-4474
 Login or create an account To view email

Published 07/07/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.