ID 494293

Archived

Otay 2nd Pipeline Phase I Project, San Diego, CA

San Diego County

Owner Reference: K-19-1832-DBB-3

Bid Date: 05/27/2019 at 02:00pm

Estimate: $9,960,000

Scope of Work: Otay 2nd Pipeline Project provides for the construction of 4,600 ft. (0.9 mile)of new 48-inch pipeline on Woodman Street between Imperial Avenue and Skyline Drive andabandoning of the existing 36-inch Otay 2nd Pipeline. The new 48-inch pipeline alignment will start at the 65th Street and Imperial Avenue and will run south crossing the trolley tracks. Then it will run east on Imperial Avenue turning south at Woodman Street and will end at Skyline Drive connecting to the existing Otay 2nd Pipeline. This new pipeline is proposed to feed the new Cielo and Woodman Pump Station. This project will relocate the existing Pressure Regulating Valve from the Imperial Avenue median, that presently posed safety hazard to maintenance personnel, to the easement South of Imperial Avenue and 65th Street. Project duration is 350 working days. Participation requirements: SLBE 8.8% ELBE 13.5%. Bonds required. Prevailing wages apply.

City of San Diego, Public Works Contracts, CA

Ronald McMinn Jr.
 (619) 533-4618
 Login or create an account To view email

Published 04/24/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.