Otay Mesa Truck Route Phase IV Project, San Diego, CA

San Diego County

Owner Reference: K-20-1717-DBB-3

Bid Date: 10/09/2019 at 02:00pm

Estimate: $8,330,000

Otay Truck Route Phase IV provides for the construction of an additional travel lane to the existing truck route for the truck traffic entering the Otay Mesa Border Crossing POE and to provide a travel lane for Border Patrol and emergency vehicles. The project limit begins at La Media Road and ends at Drucker Lane. The Project proposes replacing existing roadway pavement and subgrade. K-rails are also added to maintain the lane assignments. The project also proposes improvements such as new storm drains and green infrastructure along Otay Truck Route. The following items of work need to be completed within three months (63 Working Days) of NTP for Stage 1: clearing and grubbing, remove and replace subgrade, install retaining wall, salvage and reinstall fences, install new fence with slats, relocate parking lot lights, install parking lot curb and striping, install Jointed Plain Concrete Pavement with aggregate base and asphalt treated permeable base, install biofiltration basin, install and relocate k-rail, install decomposed granite, and construct curb and gutter on the north side of the Otay Truck Route. Project duration is 262 working days. Bonds required. Prevailing wages apply. DBE Goals apply.

City of San Diego, Public Works Contracts, CA

Antoinette Sanfilippo
 (619) 533-3439
 (619) 533-3633
 Login or create an account To view email

Published 08/29/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.