ID 496648

Archived

Paige Rd Pedestrian Hybrid Beacon Project, The Colony, TX

Denton County

Owner Reference: 69-19-019

Bid Date: 05/22/2019 at 03:00pm

Pre-Bid: 05/01/2019
City Hall, 6800 Main Street, The Colony, TX

Estimate: $178,000

The scope of work consists of the construction of a solar powered Pedestrian Hybrid Beacon north of the intersection of Yager Drive and Paige Road to address pedestrian safety while crossing the divided roadway, and any other work deemed necessary by the City of The Colony. Drainage improvements are included as well at the median cut to avoid drainage from crossing the street. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control, demolition, sidewalk, barrier-free ramps, pedestrian hybrid beacon signal, pavement markings and signage, and approximately 39 LF of 21-inch reinforced concrete pipe. Bonds required. Prevailing wages apply.

City of The Colony, Texas

Alice Pitts
 (972) 624-3145
 Login or create an account To view email

Published 04/22/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.