ID 509333

Archived

Paramount Outfall & Pump Station Elimination Project, Cary NC

Wake County

Owner Reference: 354-SW20-06

Bid Date: 09/26/2019 at 10:00am

Pre-Bid: 09/05/2019
Conference Room 21275, 2nd Floor of Cary Town Hall, 316 North Academy Street, Cary

91 LF 8-inch Ductile Iron Sanitary Sewer Pipe ± 138 LF 8-inch PVC SDR26 Sanitary Sewer Pipe ± 1,169 LF 12-inch PVC SDR26 Sanitary Sewer Pipe (8-12 ft depth) ± 450 LF 12-inch PVC SDR26 Sanitary Sewer Pipe (12-16 ft depth) ± 716 LF 12-inch PVC SDR26 Sanitary Sewer Pipe (16-20 ft depth) ± 136 LF 12-inch Ductile Iron Sanitary Sewer Pipe (0-8 ft depth) ± 226 LF 12-inch Ductile Iron Sanitary Sewer Pipe (20-24 ft depth) ± 504 LF 12-inch Ductile Iron Sanitary Sewer Pipe (24-30 ft depth) ± 6 EA Precast Concrete Manhole – 4 ft diameter (8-12 ft depth) ± 3 EA Precast Concrete Manhole – 4 ft diameter (12-16 ft depth) ± 1 EA Precast Concrete Manhole – 4 ft diameter (16-20 ft depth) ± 4 EA Precast Concrete Manhole – 4 ft diameter (20-24 ft depth) ± 2 EA Precast Concrete Manhole – 5 ft diameter (24-30 ft depth) ± 2 EA Manhole Vent Assembly ± 2 EA 8-inch Cored Connection to Existing Manhole ± 2 EA 12-inch Cored Connection to Existing Manhole ± 2 EA Sanitary Sewer Protection ± 130 LF Boring and Jacking, Encasement Pipe 30-inch diameter ± 1 LS Microtunneling (does not include carrier pipe) ± 1 LS Launch and Receiving Shafts ± 584 LF 12-inch Ductile Iron Sanitary Sewer Carrier pipe ± 4 EA 8-inch Ductile Iron Cap ± 5 EA Sewer Main Cap ± 4 EA Abandon Sewer Manhole (Unpaved area) ± 169 LF Abandon Sewer Main (Paved area) ± 500 LF Abandon Sewer Main (Unpaved area) ± 1 LS Abandon Sewer Force Main ± 1 LS Remove sewer aerial crossing ± 1 LS Remove/Demolish Pump Station ± 9 EA Pre/Post Construction Residential Blasting Survey ± 9 EA Pre/Post Construction Well Survey and Testing.

Town of Cary

Alex Lopez
 (191) 946-9409
 Login or create an account To view email

Published 08/15/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.