ID 526399

Archived

Pavement Marking Upgrades Project, Atlanta GA

Dekalb County

Owner Reference: M006016

Bid Date: 02/21/2020 at 10:00am

9.535 Miles of Pavement Marking Upgrades on I-20 /sr 402 Beginning East of Windsor St and Extending West of Columbia Drive. All pavement markings, both interim and permanent, shall be applied to a clean surface. The Contractor shall furnish the layout and preline the roadway surface for the placement of pavement markings applied as part of the temporary traffic control plan. All interim marking tape and RPM’s on the final surface shall be removed prior to the placement of the final markings. This work includes constructing and removing: Silt control gates, Temporary erosion control slope drains shown on the Plans or as directed, Temporary sediment basins, Sediment barriers and check dams , Rock filter dams,Stone filter berms, Stone filter rings. This work includes constructing a cement stabilized base course by pulverizing the existing flexible pavement, underlying base and subgrade, and mixing with Portland cement. Construct according to these Specifications and to the lines, grades, thickness, and typical cross-sections shown on the Plans or established by the Engineer. A roadway section more than 0.5 mile (800 m) long that is not longitudinally adjacent to the existing roadway. If one or more lanes are added longitudinally adjacent to the existing lane, the lane(s) shall be tested under the criteria for a resurfacing project. If work is performed on the existing roadway including leveling, grade changes, widening and/or resurfacing then that lane shall be tested under the criteria for a resurfacing project. This project encouraged MBE/WBE participation.

Georgia Department of Transportation

Robbie Bridges
 (404) 631-1148
 Login or create an account To view email

Published 01/28/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.