ID 495850

Archived

Pavement Rehabilitation 2018-2019 RSTP Project, Bakersfield, CA

Kern County

Owner Reference: T9K218

Bid Date: 05/02/2019 at 11:00AM

Estimate: $4,881,000

The work to be performed consists, in general, of pavement rehabilitation on District Blvd from Gosford Road to Stine Road. Work shall include full depth reconstruction of the roadway. Other items include roadway excavation, construction of new pavement using Hot Mix Asphalt (HMA), installation of pavement striping and markings, traffic detector loops, modification of existing curbs and gutters, access ramps to meet current ADA standards, installation of cross gutters, and adjustment of manholes and monuments. Project duration is 60 working days. Bonds required. Prevailing wages apply.

City of Bakersfield PW

Gurjeet S. Antal
 (661) 326-3585
 (661) 852-2120
 Login or create an account To view email

Published 04/14/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.