ID 532338

Archived

Peeler Road Sidewalks from Equestrian Way to Cherring Lane Project, Dunwoody GA

Dekalb County

Owner Reference: ITB 20-01

Bid Date: 04/10/2020 at 02:00pm

Pre-Bid: 03/25/2020
City of Dunwoody Courtroom 4800 Ashford Dunwoody Rd, Dunwoody, GA 30338

The Peeler Road Sidewalks Project consists of road widening with curb and gutter, storm drain installation, retaining walls, and sidewalk along Peeler Road from Equestrian Way to Cherring Lane. The contractor shall furnish all materials, equipment, and labor to complete the required construction as described in its entirety to the specifications as directed and the terms of this contract including all incidentals as directed by the City of Dunwoody Director of Public Works or his representative. A five percent (5%) bid bond, a one hundred percent (100%) performance bond, and a one hundred percent (100%) payment bond shall be furnished to the City of Dunwoody for any bid as required in bid package or document. Failure to submit appropriate bonding will result in automatic rejection of bid.

City of Dunwoody

John Gates
 (678) 382-6700
 Login or create an account To view email

Published 03/16/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.