ID 532705

Archived

Phase 1 of Transmission Water Main Replacement Project, Dalton GA

Whitfield County

Owner Reference: Ph1TransWaterMain2020

Bid Date: 04/15/2020 at 01:00pm

Pre-Bid: 04/06/2020
DU Main Building, 1200 V.D. Parrott Parkway Dalton GA 30722

Construct the Phase 1 of Transmission Water Main Replacement Project as shown in the drawings and specifications. The project will include the construction of 36 inch Ductile Iron Pipe water main as shown on the drawings. The water main to be constructed for this project will start at Dalton Utilities Riverwater Treatment Plant existing 36 inch DIP and tie into an existing 30 inch DIP water main along Lower Dawnville Road as shown on the plans. This includes but not limited to installing a 36-inch DIP main, approximately 4,100 linear feet in length.

Dalton Utilities

Charlie Morrow
 (706) 529-1176
 Login or create an account To view email

Published 03/16/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.