ID 526378
Archived
Banks County
Owner Reference: M004808
Bid Date: 02/21/2020 at 10:00AM
17.980 Miles of Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on I-85/SR 403 Beginning North of Sr 63 and Extending South of Sr 17. Construction waste or debris, from bridge construction or demolition, shall be prevented from being allowed to fall or be placed into wetlands, streams, rivers or lakes. Excavation, dewatering, and cleaning of cofferdams shall be performed in such a manner as to prevent siltation. Pumping from cofferdams to a settling basin or a containment unit will be required if deemed necessary by the Engineer. This work includes clearing, grubbing, removing and disposing of vegetation, buildings and debris within the entire Right-ofWay and easement areas adjacent to the Right-of-Way or as designated by the Engineer. Except, do not remove objects designated to remain or removed according to other sections of these Specifications. This work also includes preserving (from injury and defacement) vegetation and objects designated to remain in place. A roadway section more than 0.5 mile (800 m) long that is not longitudinally adjacent to the existing roadway. If one or more lanes are added longitudinally adjacent to the existing lane, the lane(s) shall be tested under the criteria for a resurfacing project. If work is performed on the existing roadway including leveling, grade changes, widening and/or resurfacing then that lane shall be tested under the criteria for a resurfacing project. Trench Widening: Widening no more than 4 ft. (1.2 m) in width. This project encouraged MBE/WBE participation.
Department of Transportation Atlanta, GA
Sonja Garland
(404) 631-1549
Login or create an account To view email
Published 01/28/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.