ID 504154

Archived

REBID Asset and Furniture Inventory, Move, Storage and Reassembly Project, San Bruno CA

San Mateo County

Owner Reference: 18-5271

Bid Date: 07/18/2019 at 03:00pm

Pre-Bid: 07/11/2019
Conference Room 113, San Bruno City Hall, 567 El Camino Real, San Bruno, California, 94066

The work includes, but is not limited to: mobilization and demobilization, furnishing and installing 762 new water meters and activating endpoints, coordination with businesses by contacting each business owner in advance of meter change out; schedule any off hours work accordingly based on input from each respective customer/business owner, removal and disposal of any amount of dirt and water needed to access the meter in the meter pit or vault, capturing GPS positing from meter pit with 3-meter accuracy using geo-positioning software and providing GIS shapefile to City, furnishing three pictures of each installation; before, final reading and after, verifying the MXU reading from the street and record it in the database, replacing any landscape or hardscape damaged during the installation process, site cleaning and removal of debris, equipment, and excess material from the sites upon completion of work, and other work as shown on Drawings or indicated in the Specifications.

City of San Bruno, Public Works, CA

Barker Blue
 (866) 347-1011
 (650) 794-1443

Published 06/25/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.