ID 505218

Archived

Rebid Deer Creek Phase IX Water Supply Plant No. 8 Project, Parker Co., TX

Dallas County

Owner Reference: 21627

Bid Date: 07/25/2019 at 10:00am

Estimate: $410,000

The Stonegate Partners, LLC and Deer Creek LP is inviting bids for all labor, tools, equipment, and expenses to perform the construction/installation of yard piping, a 94,000 gallon bolted galvanized steel ground storage tank, two (2) high service pumps each capable of pumping 250 gpm each, a 5,000 gallon hydro-pneumatic tank, and a control/pump building to house the water system controls, scada equipment, chlorination equipment, and other miscellaneous appurtenances. The entire project site shall be graded, seeded, and fenced. Temporary erosion control shall be provided, and an access drive/parking area shall be constructed. Bonds required. Prevailing wages apply.

Stonegate Partners, LLC, TX

Glenn Breisch
 (817) 441-1300
 (817) 441-1033
 Login or create an account To view email

Published 07/07/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.