ID 490038

Archived

Rebid Northgate Bridge & 1st Ave NE Protected Bike Lane Project, Seattle WA

King County

Owner Reference: 2018-050

Bid Date: 06/12/2019 at 02:00pm

Pre-Bid: 06/05/2019
OR 3/19/2019 @ 1pm. North Seattle College (9600 College Way N, Seattle, WA 98103) Please meet at north parking lot in North Seattle College (9600 College Way N, Seattle, WA 98103.) Please bring hardhat, boots and PPE vest.

Estimate: Base Bid= $22.5M; Additive= $1.2M

WMBE 9%.The base bid project will build a Bicycle/pedestrian bridge in the Northgate area of Seattle. The bridge will overcross I-5 along N/NE 100th Street. The base bid project will also provide a spur connection bridge overcrossing 1st Ave NE that connects to the Sound Transit Light Rail Station. A multi-use trail connection west of I-5 is included in the base bid. Base bid work includes temporary traffic control, earthwork, asphalt paving, concrete and steel bridge construction, retaining walls, drilled shafts, storm drains, detention pipe, landscaping, wetland mitigation, concrete curbs, driveways, sidewalks, curb ramps, signing, channelization, lighting, and signals. The additive involves bicycle and pedestrian improvements on 1st Ave NE. The Additive work includes temporary traffic control, earthwork, asphalt paving, curb and gutter, sidewalks, curb ramps, signing, channelization, lighting and signals.

City of Seattle (SDOT), WA

Carl Gao
 (206) 684-8032
 Login or create an account To view email

Published 05/22/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.