ID 534696

Archived

Rebid SE 1st Street Improvements Project, Winlock WA

Lewis County

Bid Date: 04/15/2020 at 01:30pm

Estimate: Sched A $390,000 - $410,000 Sched B $340,000 - $360,000

Scope includes construction of the SE 1st St & consists of reconstructing the existing roadway & installing two 10.5 FT travel lanes & replaced the 5 Ft wide sidewalks on both sides of the roadway. Work includes clearing & grubbing, excavation, pulverizing the existing cement concrete panels, cement concrete sidewalk removal, grading, installation of ADA compliant curb ramps, sidewalks, traffic curbs, driveways, signage, markings, stormwater improvements, HMA, traffic control and related work. 80 working days. Proposal will be opened & read aloud by conference call only. Call 360-785-2311 to join the conference call.

City of Winlock, WA

Jon Hinton, G&O
 (360) 785-3811
 (360) 785-4378
 Login or create an account To view email

Published 04/03/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.