ID 527878

Archived

Rehabilitate Landside Storm Sewer Project DFW Airport, TX

Dallas County

Owner Reference: 9500680

Bid Date: 03/31/2020 at 02:00pm

Pre-Bid: 02/20/2020
International Airport Board, Design, Code and Construction Offices, 3003 South Service Road, DFW Airport, TX 75261

The Work of this Contract comprises of rehabilitation of storm sewer and collapsed soils, including removal of existing RCP and replacing with PVC, new storm sewer structures excavation and backfill. Construction will be outside the Airport’s Air Operations Area (AOA). The Contractor shall be responsible for reviewing all existing conditions associated with the Work prior to commencement of work activities. DBE/MBE Goal 25%. Bonds required. Prevailing wages apply.

DFW Airport Headquarters, TX

Dalia Sanders
 (972) 973-5600

Published 02/07/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.