ID 533251

Archived

Replacement Of The Hill Boulevard Bridge Over Barger Brook Tributary Project, Yorktown Heights NY

Westchester County

Owner Reference: 8761.66

Bid Date: 04/17/2020 at 02:00PM

Pre-Bid: 03/31/2020
Corner of Greenwood Street And Veterans Road Yorktown, NY

The work at Hill Boulevard shall consist of: Coordination with utility companies to ensure protection and relocation of underground utilities. Contractor to relocate municipally-owned water and sewer lines. Installation of MPT measures and detour signage to allow the bridge work to proceed under a full roadway closure. Installation of a temporary waterway diversion structure to allow construction to proceed in dry conditions. Installation of soil erosion and sediment control measures as required. Removal of the existing twin corrugated metal pipes, concrete head-walls, and excavation of the surrounding fill to accommodate the proposed structure. Installation of a concrete invert slab. Installation of a 3-sided precast concrete rectangular frame and precast concrete wing-walls. Back-fill with structural fill, installation of natural stream-bed material, and placement stream bank and / or slope protection in the form of stone fill. New pavement and new roadway appurtenances as necessary, including box beam guide rail, signage, and striping. Topsoil, seeding, and landscaping as necessary to restore disturbed areas. This project encouraged MBE/WBE participation.

Town of Yorktown

Michael Quinn
 (914) 962-5722
 Login or create an account To view email

Published 03/19/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.