ID 505615

Archived

Residential Street Paving Program Project West Hollywood,CA

Los Angeles County

Owner Reference: CIP 1806

Bid Date: 07/18/2019 at 10:00AM

Estimate: $885,000

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents. The general items of work include pavement preparation, cold milling, street resurfacing, pavement striping and markings, loop replacement, adjustment of manhole frame and utility covers to grade, and other items not mentioned that are required by the plans and specifications. The general location and limits of the work are: • Formosa Ave. between Lexington Ave. and Santa Monica Blvd.• Greenacre Ave. from cul-de-sac to Santa Monica Blvd.• Vista St. between Fountain Ave. and Santa Monica Blvd.• Gardner St. between Santa Monica Blvd. and Willoughby Ave.• Sierra Bonita Ave. between Santa Monica Blvd. and Willoughby Ave.• Stanley Ave. between Santa Monica Blvd. and Willoughby Ave.• Spaulding between Fountain Ave and Santa Monica Blvd.• Spaulding between Santa Monica Blvd. and Willoughby Ave.• Genesee Ave. between Fountain Ave. and Santa Monica Blvd.• Genesee Ave. between Santa Monica Blvd. and Willoughby Ave.• La Cienega between north of Fountain Ave. to Holloway Dr.• Sweetzer Ave between alley south of Santa Monica Blvd. and Willoughby Ave. Bonds required. Prevailing wages.

City of West Hollywood, CA

Mila Sologub
 (323) 848-6338
 Login or create an account To view email

Published 07/10/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.