ID 499547

Archived

RFP Spokane St. Pump Station Improvements Project, Seattle WA

King County

Owner Reference: 19-042-S

Bid Date: 06/18/2019 at 03:00pm

Pre-Bid: 05/30/2019
5/15 @ 10am, 5/16 @ 2 pm West Seattle: 3214 SW Spokane Street Site visits, & 5/30 prebid 700 Fifth Ave, Floor 16, Room 1600, Seattle, WA 98104

Estimate: $1.2M - $2.0M

The City of Seattle Public Utilities (SPU) is seeking a consultant team to provide design and engineering services leading to the removal and replacement of a drinking water pump station building shell, including changes to the existing electrical service for the pumps and a new building electrical system. The initial contract will cover the design phase only, and the subsequent phases will be performed through an amendment to the contract and include engineering support services during construction, and close out. Existing pumps will remain, but do not need to be operational during construction. Mitigation measures may be required for the removal of the existing building.

City of Seattle, Public Utilities

Sherry Parker
 (206) 684-7615
 Login or create an account To view email

Published 05/17/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.