ID 534294

Archived

Rope Mill Rd Resurfacing Cardinal Dr to Angela Project, Woodstock GA

Worth County

Owner Reference: 202014

Bid Date: 04/28/2020 at 02:00pm

The work to be done consists of the furnishing of all materials, labor and equipment for the complete construction of the Rope Mill Rd Resurfacing – Cardinal Dr to Angela Ct (Pw 19-264). A construction timeframe of 45 calendar days is anticipated. Payment will be made to the Contractor each calendar month based on the estimated work completed and in place as described by the standard specifications. Final payment of amounts withheld or deposited in escrow will not be made until the City of Woodstock, Georgia has certified that the work has been satisfactorily completed and accepted. A 5% bid bond (or certified check in lieu of bond) is required.

City of Woodstock, GA

Crystal L. Welch
 (770) 592-6000
 (770) 926-1375
 Login or create an account To view email

Published 03/30/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.