ID 508784

Archived

Row River Water Treatment Plant Expansion Project, Cottage Grove OR

Lane County

Bid Date: 09/11/2019 at 10:00am

Pre-Bid: 08/19/2019
City Hall, followed by a site visit.

The project consists of the construction of the following work and all work incidental thereto, as set forth in the project plans and specifications. The work generally consists of addition of a Membrane Filtration (MF) Unit and strainer; replacement of obsolete MF System solenoid manifolds and turbidimeters with controllers; installation of a filter influent pipeline, an excess recirculation pipeline, and sample pipeline; installation of piping, electrical, and signal connections to connect the MF Unit to the existing MF System; modifications to the existing MF Control System. Bidders must be pre-qualified with the City of Cottage Grove

City of Cottage Grove
 (541) 942-5501

Published 08/11/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.