The Project consists of the following major elements: The work generally consists of replacing the existing dewatering equipment (centrifuge) with a volute press and high solids pumping unit to deliver the dewatered sludge to the dumpster area, modifications to the existing dewatering building (including new siding, roof, insulation, concrete floors, control room, etc.) and constructing a new dumpster pad with roof.
City of Woodstock, GA
Amber Tucker
(770) 592-6000
(770) 926-1375
Login or create an account To view email
Published 09/17/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.