ID 524995

Archived

Salmon Creek Treatment Plant Odor Control/Facilities Improvements, Vancouver WA

Clark County

Owner Reference: *

Bid Date: 02/27/2020 at 02:00pm

*For combined Schedule A, Phase 5B Project; Package 1, Salmon Creek Treatment Plant Odor Control and existing vacilities improvements, Discover Clean Water Alliance Proj No 92-2017-0053 and Schedule B, Salmon Creek Treatment Plant repair & rep-lacement projects, Discovery Clean Water Alliance Proj 93-2018-0086, 93-2018-0089,93-2018-0096, 93-2019-0012, and 93-2019-0072. Sched A: construction of all components of the project for Salmon Creek odor control & improvements. Work includes construction of new odor control facilities, construction of a new oil storage building, demolition of an existing building, modifications to existing aeration basins, yard piping, process piping replacement, small hypochloride feed system, new enclosure around existing waste gas incinerator control equipment, new canopy over ultraviolet disinfection equipment, and all other items. Sched B: Construction of components of Salmon Creek plant repair & replacement. Work includes maintenance and modifications to one aerobic digester and minor modifications to a second anaerobic digester, removal and replacement of one biosolids cake transfer screw conveyor, removal and replacement of 2 boiler exhaust stacks, installation of digester gas blower equipment and piping, removal and replacement of HVAC systems in Bdgs 70 & 72 and all other work.

Clark Regional Wastewater Dist, WA
 (360) 750-5876

Published 01/14/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.