ID 533247

Archived

Saranac Digital Substation Project, White Plains NY

Westchester County

Owner Reference: Q20-6909NF

Bid Date: 04/29/2020 at 04:00PM

The major project scope items include engineering, design, procurement, delivery, and installation and commissioning of a new Control House, an IEC 61850 based, integrated Substation Protection, Automation and Control system, and an emergency Diesel Generator. Additionally, the following items are also included in the Contractor’s scope: Digging and construction work at the substation for cable trenching, footings and foundations; Replacement /Installation of four 115KV circuit breakers (new circuit breakers to be provided by the Authority); Replacement of existing Disconnect Switches; Development of new operating, maintenance and test procedures for the new IEC 61850 Digital Substation architecture. This project encouraged MBE/WBE participation.

New York Power of Authority

Nancy Florence
 (914) 390-8268
 Login or create an account To view email

Published 03/18/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.