SCWQP Tunnel Storage Project, Seattle WA

King County

Owner Reference: 2018-018

Bid Date: 06/12/2019 at 02:00pm

Pre-Bid: 03/21/2019
OR 3/26/2019 @ 10am. 5300 24th Ave NW, Seattle, WA 98107

Estimate: $219M

Install a 13,939 foot-long, 18-foot 10-inch internal diameter, segmentally lined tunnel constructed with a pressurized face Tunnel Boring Machine (TBM); construct 5 shafts to include civil, architectural, structural, mechanical, HVAC, electrical, and instrumentation work; install a 646 foot-long, 94-inch internal diameter, conveyance tunnel under the Lake Washington Ship Canal using a Microtunnel Boring Machine (MTBM); install surface conveyance piping and structures, and site restoration at all shaft locations.

City of Seattle, Public Utilities

Ryan Brady
 (206) 684-3617
 Login or create an account To view email

Published 04/29/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.