ID 509970

Archived

Seattle Center Monorail Electrical Room Upgrades Project, Seattle WA

King County

Owner Reference: PW#2018-090

Bid Date: 10/09/2019 at 02:00pm

Pre-Bid: 09/04/2019
OR Session 2: Sept 9 at 2 pm, both are at Seattle Center, in the Armory Building, 305 Harrison St. Suite 109, Seattle, WA 98019.

Estimate: $1,950,000 + WSST

15% apprentice utilization required. 3% DBE goal This project will perform building and equipment upgrades to the Seattle Center Monorail Electrical Rooms and systems at Seattle Center and Westlake Center Monorail Stations. The Work will include acquiring medium and low voltage equipment (rectifier, transformer, switchgear, battery chargers, uninterruptible power supplies, annunciator panels, etc.); running a 120ft underground feed from a 3-phase 208VAC transformer to the Seattle Center Monorail Station electrical room in existing conduit; installation and wiring of equipment; and testing and commissioning. In addition to other Work, new HVAC equipment, intrusion alarm system, fire alarm system, and emergency lighting will be added in the rooms at both stations.

City of Seattle (PW), WA

Stephen Levengood
 (206) 684-0444
 (206) 684-4511
 Login or create an account To view email

Published 09/06/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.