Seattle Municipal Tower Envelope Improvements Project, Phase IV, Seattle WA

King County

Owner Reference: 2020-009

Bid Date: 04/08/2020 at 02:00pm

Pre-Bid: 03/18/2020
OR 3/23/20 @ 9 am. 700 5th Avenue, Floor 40, Room 4070, Seattle, WA 98104

Estimate: Base: $1,403,627; Additive Alternate #1: $171,054; Additive Alternate #2: $235,458; Additive Alternate #3: $493,809

Project Description: Boundary includes all areas on the East façade of the building near gridlines L&P, 1&4, from floors 14 to 63 as indicated on the drawings: Exterior Sealant Replacement: 1) Removal of existing elastomeric sealant at sealant conditions (including but not limited to Stone, Metal, EIFS, Curtainwall) 2) Partial Removal of glazing unit gasketing to be replaced 3) Taping glazing area where gasketing is removed to provide clean fillet joint 4) Surface cleaning and prep for new sealant joints 5) Installation of backer rods or bond breaker tape, and elastomeric sealant. Repair of broken or cracked stone panels, including but not limited to: 1) Cleaning, prepping and filling of areas of spalling/missing corners 2) Cleaning, prepping, reinforcing, and filling cracks Additive Alternate #1: Boundary includes all area on the North plaza of the building near gridlines E&G, 1&4 from floor 6 to underside of alcove ceiling at floor 10 as indicated on the drawings: Exterior Sealant Replacement: 1) Removal of existing elastomeric sealant at sealant conditions (including but not limited to Stone, Metal, EIFS, Skylight, Storefront) 2) Partial Removal of glazing unit gasketing to be replaced 3) Taping glazing area where gasketing is removed to provide clean fillet joint 4) Surface cleaning and prep for new sealant joints 5) Installation of backer rods or bond breaker tape, and elastomeric sealant. Repair of broken or cracked stone panels, including but not limited to: 1) Cleaning, prepping and filling of areas of spalling/missing corners 2) Cleaning, prepping, reinforcing, and filling cracks Additive Alternate #2: Boundary includes all area on the South plaza of the building near gridlines E&G, 8&11 from floor 6 to underside of alcove ceiling at floor 10 as indicated on the drawings: Exterior Sealant Replacement: 1) Removal of existing elastomeric sealant at sealant conditions (including but not limited to Stone, Metal, EIFS, Skylight, Storefront) 2) Partial Removal of glazing unit gasketing to be replaced 3) Taping glazing area where gasketing is removed to provide clean fillet joint 4) Surface cleaning and prep for new sealant joints 5) Installation of backer rods or bond breaker tape, and elastomeric sealant. Repair of broken or cracked stone panels, including but not limited to: 1) Cleaning, prepping and filling of areas of spalling/missing corners 2) Cleaning, prepping, reinforcing, and filling cracks Additive Alternate #3: Boundary includes all area on the North façade of the building near gridlines B&E, 1&11, from floor 6 to underside of ceiling at floor 14 as indicated on the drawings: Exterior Sealant Replacement: 1) Removal of existing elastomeric sealant at sealant conditions (including but not limited to Stone, Metal, EIFS, Curtainwall) 2) Partial Removal of glazing unit gasketing to be replaced 3) Taping glazing area where gasketing is removed to provide clean fillet joint 4) Surface cleaning and prep for new sealant joints 5) Installation of backer rods or bond breaker tape, and elastomeric sealant.

City of Seattle, Admin Svcs, WA

Michael Johnson
 (206) 386-1367
 Login or create an account To view email

Published 03/15/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.