Sewer & AC Water Crown Point West Project, San Diego, CA

San Diego County

Owner Reference: K-19-1824-DBB-3

Bid Date: 04/26/2019 at 02:00pm

Pre-Bid: 04/04/2019
Wada Room, 525 B St., Suite 750A, San Diego, CA

Estimate: $18,600,000

Construction consists of the Installation & Relocation of approximately 20,705 LF of existing 6, 8, 10, 12, 15 & 18 inch sewer main, from easements to the right of way, replumbing of approximately 196 sewer laterals, abandonment of approximately 8008 LF of easement sewer main, replacement of approximately 12,887 lf of existing 8, 12-inch water main with new 8 inch & 12 inch PVC pipe, associated improvements will include curb ramps, street resurfacing and other work and appurtenances. Project Duration: 1100 Working Days. 1. SLBE participation 9% 2. ELBE participation 13.3%3. Total mandatory participation 22.3% Bonds required. Prevailing wages apply.

City of San Diego, Public Works, CA

Celina Suarez
 (619) 533-6678
 Login or create an account To view email

Published 03/25/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.