ID 529722

Archived

Sidewalk Repair & Replacement (2020-2022) Project, Foster City, CA

San Mateo County

Bid Date: 03/12/2020 at 02:00pm

The City of Foster City is requesting proposals for Sidewalk Repair and Replacement Project. The goal of the project is to protect the safety of pedestrians by minimizing potential risks and liabilities and to maintain the appearance of sidewalks with a high level of service in Foster City. Concrete replacement shall be completed within 30 calendar days from commencement of work. Work shall commence within fourteen (14 calendar days) of notification by the City. Bonds may be required. Prevailing wages apply.

City Of Foster City

Greg Baeza
 (650) 286-3551

Published 02/21/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.