ID 493625

Archived

SOQ Engineering / Design Build/ Construction Services Project, Washington Co., UT

Washington County

Owner Reference: SOQ Open

Bid Date: 12/31/2019 at 02:00pm

The Washington County Water Conservancy District is inviting statements of qualification for the following tasks; master plans, water resource plans, impact fee facility plans and analysis, environmental compliance, right-of-way acquisition, geotechnical services, materials testing, pipelines, pump stations, groundwater development, well construction, maintenance, and rehabilitation, concrete and steel tanks, concrete and steel structure coatings, water treatment plant construction, process improvement, maintenance, and repair, water quality, Safe Drinking Water Act compliance, secondary irrigation water systems, hydroelectric power generation, dam construction, maintenance, and repair, wastewater treatment systems, electrical, instrumentation, and SCADA/telemetry systems, corrosion control, structural and seismic engineering, architecture, landscape architecture, water rates, water rights, and other similar services. The SOQ shall contain the following: 1) Name of firm, location of all offices, and location of principal office serving the DISTRICT. 2) Age of firm, average number of employees over the past five years in the principal office serving the DISTRICT. 3) Education, training, qualifications and availability of key employees of the firm, specifically those in the principal office serving the DISTRICT. 4) Experience, special technical capabilities and expertise of the firm, and available equipment necessary or useful in pertinent types of professional work 5) References from at least five clients and previous projects, including two from the preceding year. 6) Any other relevant information.

Washington County Water Conservancy District

Randy Johnson
 (435) 673-3617
 Login or create an account To view email

Published 03/28/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.