ID 494685

Archived

Southfield Pavement Improvements Phase 2 Project, Oakland CA

Alameda County

Owner Reference: 2019-03-A1

Bid Date: 04/25/2019 at 10:00 AM

Pre-Bid: 04/16/2019
Shepard-Glenn Building, Conference Rooms A & B, Oakland International Airport, Oakland, California

Estimate: $1,600,000

The work of this 120 calendar day project consists generally of furnishing all labor, materials, appliances, tools, equipment, transportation, services and supervision required to complete the pavement improvements, including, but not limited to: installing temporary barricades; removing existing asphalt concrete and striping markings; installing new asphalt pavement; installing new Portland cement concrete pavement; installing new striping markings; installing new joint sealant; and performing all associated work, in accordance with the Contract Documents. Prevailing wages apply. Bonds required.

Port Of Oakland

Owen He
 (510) 627-1197
 (510) 272-9329
 Login or create an account To view email

Published 04/04/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.