ID 509869

Archived

SR164 Pussyfoot Creek 6” Pipeline Relocation Project, Enumclaw WA

King County

Bid Date: 09/13/2019 at 10:00am

Pre-Bid: 08/27/2019
site visit

Estimate: $939,400

Scope includes multiple hot taps, stopples, abandoning and 3existing 6” steel gas pipeline and installing a new 6” steel gas pipeline via HDD techniques and maintaining system pressure and flow. Additionally an existing 6” ball valve and valve pit will need to be removed and replaced with a new 6” ball valve and valve pit. An above grade 6” steel temporary bypass will be installed and utilized while work on the replacement valve and valve pit is being completed. The pipeline is a single source of supply operated at 250 Psi and has a peak demands of 339,Mcf/hr

City of Enumclaw, WA
 (360) 615-5787

Published 08/25/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.