ID 527424

Archived

Still Creek WWTP Dumpster Conveyor and Aeration Improvements Project Bryan,TX

Brazos County

Owner Reference: 20-023

Bid Date: 03/05/2020 at 02:00pm

Pre-Bid: 02/18/2020
Municipal Service Center, 1111 Waco St, Bryan,TX 77803

The City of Bryan is seeking a contractor for the improvements to the Still Creek Wastewater Treatment plant, including the installation of a mechanical bar screen and dumpster conveyor system.Demolition of an existing aeration blower and appurtenances and installation of a new aeration blower and appurtenances. including a new local control panel. Installation of a conveyor system used to move the dewatered sludge roll-off dumpster, with associated pavement improvements. Additive scope items include installation of a buried plug valve in an existing drain line and replacement of slide gates in the effluent box of the aeration basins. Electrical modifications to accommodate the work.Q&A due 02/21/20 at 10AM. Bonds required. Prevailing wages.

City of Bryan, TX

Laura Perez
 (979) 209-5504
 (979) 209-5507
 Login or create an account To view email

Published 02/04/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.