ID 507557
Archived
Dauphin County
Owner Reference: BL-1199
Bid Date: 08/28/2019 at 01:00PM
Pre-Bid: 08/08/2019
Waller Administration Bldg, Conf Rm 38A
Estimate: GC $145K - $155K HVAC $55K - $65K
Work included under this project consists of consists of chiller plant piping support of Soltz Hall at the Bloomsburg University of PA. Work entails 1. Re-support existing chilled water piping from the floor and re-level piping. 2. Repair and replace various parts including but not limited to equipment piping connections, spring isolators, and pump motors.
PASSHE Pennsylvania State System of Higher Education, PA
Brandi Yagle
(717) 724-4113
(717) 720-4111
Login or create an account To view email
Published 07/30/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.