ID 497955

Archived

Storm Drainage Improvements Project, Greensboro NC

Guilford County

Owner Reference: 2018-019

Bid Date: 05/30/2019 at 03:00pm

Pre-Bid: 05/15/2019
Melvin Municipal Office Building 3rd Floor Engineering Conference located at 300 West Washington Street, Greensboro, NC

The work in this contract consists of two projects. Burnt Poplar Road consists of the removal of an existing 72” stormwater line and replacement with a 945 lf of precast concrete box culvert and associated structures. Fairview Street consists of the replacement of a 36” CMP system with a new 36” RCP and associated structures. All materials and workmanship shall be in accordance with all reference plans and specifications herein. In regards to scheduling, the work on Fairview Street is to be performed first. This project encouraged MBE/WBE participation.

City of Greensboro

Danny Hawk
 (336) 373-2489
 Login or create an account To view email

Published 05/03/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.