ID 504614

Archived

Street Improvements & Widening On College Ave Project, Bakersfield, CA

Kern County

Owner Reference: T7K205

Bid Date: 07/18/2019 at 11:00AM

Estimate: $836.000

The work to be performed consists, in general, of demolition of existing improvements; roadway excavation; construction of new roadway pavement consisting of aggregate base (Class 2) and hot mix asphalt (HMA Type A); installation of new street lights; constuction of concrete curb and gutter, sidewalk, drive approaches and V-gutter; construction of a mechanically stabilized embankment (MSE) retaining wall, including structure excavation, structure backfill, and installation of geogrid soil reinforcement and an underdrain system; removal and relocation or salvage of existing roadway signs; installation of new roadway signs; removal of existing traffic striping and pavement markings; placement of new traffic striping and pavement markings; construction of new chain link fence and fence gates; and relocation of existing mast arm signal heads and signs at the intersection of Fairfax Road/College Avenue. Project duration is 50 Working Days. Bonds required. Prevailing wages apply.

City of Bakersfield PW

Cathy Mojibi
 (661) 326-3723
 (661) 852-2120
 Login or create an account To view email

Published 06/30/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.